Court Maintenance Today

The court surfaces will be maintained today, Wednesday. The contractor will arrive on site at 7.30am ready to start the scheduled Powerbrush at 8.00 on the far two courts (6/7) until 10.00 then move onto the next double courts (4/5) until 12.00 and ending on the triple courts (1/3) until 3.00 pm.